KAN Wei-min, HU Peng-fei, XIE Dan-mei, XIONG Yang-heng. Simulation Study on 1 000-MW Unit Speed Rise During Load SheddingJ. Electric Power, 2014, 47(4): 22-26. DOI: 10.11930/j.issn.1004-9649.2014.4.22.4
Citation: KAN Wei-min, HU Peng-fei, XIE Dan-mei, XIONG Yang-heng. Simulation Study on 1 000-MW Unit Speed Rise During Load SheddingJ. Electric Power, 2014, 47(4): 22-26. DOI: 10.11930/j.issn.1004-9649.2014.4.22.4

Simulation Study on 1 000-MW Unit Speed Rise During Load Shedding

  • Load shedding is the worst operation scenario for large turbo-generator sets, which will increase rotor speed rapidly and threaten the safety of units greatly. In this paper, the maximum speed rise of a 1 000-MW unit is simulated with Simulink, and quantitative analysis on the influence of reheat steam volume time constant and rotor time constant on the dynamic characteristics of the governing system is performed. Combined with the on-line test data, the fast cut back (FCB) condition is simulated with the speed rise estimated.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return