火力发电厂现场总线技术调试难点分析与研究
Analysis and Study on the Difficulties in Fieldbus Commissioning in a Thermal Power Plant
-
摘要: 通过某电厂现场总线工程的实施应用,从管理和技术角度全面分析了现有技术条件下火力发电厂现场总线工程调试中遇到的难点问题。管理方面,系统性地提出现场总线工程实施中的组织分工原则及总体调试流程,技术方面,对调试中普遍遇到的难点问题进行集中归纳总结并给出应对方法。在现场总线工程调试标准不完善的情况下,为同类工程应用提供系统性的解决方案。Abstract: Through the implementation and application of fieldbus in huaneng luntai power plant, this article fully analyzes the difficulties in the fieldbus commissioning process from the aspects of management and technology under the current technology conditions. Specifically this article systematically puts forward the principle of the organization division of labor and the overall commissioning process in terms of management, while summarizes the difficulties encountered in the commissioning process from technical viewpoints. The study results will provide a systematic solution to the similar types of engineering applications under the circumstances of incomplete engineering commissioning standard.